Projects Details

Stage 5 works at Good Samaritan Catholic College, Bli Bli, comprising the construction of a new covered lunch area and undercroft locker facilities at ground level, a new first-floor administration precinct seamlessly integrated with the existing building, and the infill of an existing space to create additional general learning areas and flexible teaching spaces. The project also included a complete internal fit out and the construction of an external covered link connecting the adjoining building.
Share this Project
Scroll to Top